Old Northern Road, Wisemans Ferry and Maroota diversion

 Transport for NSW will be carrying out urgent repairs to the heritage listed dry stone retaining wall and guard rail barrier, include some road resurfacing on Old Northern Road, at the last bend before entering Wisemans Ferry.

During full road closures, local access to Old Northern Road will be maintained under traffic control via Wisemans Ferry Road and River Road for residents and businesses located on either side of the work site.

General access will be maintained to the area north of the work area however using the following alternate route. Please note this route may take approximately 2 hours and 20 minutes of additional travel time so please plan accordingly.

  • Old Northern Road at Maroota, to Castle Hill Road, Pennant Hills Road, M1 Pacific Motorway, Peats Ridge Road, George Downes Drive and Wisemans Ferry Road to access the northern side of the Hawkesbury River. Note that the vehicle ferry will be required to cross to the township of Wisemans Ferry.
  • There are other local access routes in the area but these are not recommended due to the condition of the road not being suitable for high volumes of traffic or any heavy vehicles.

The work will take place from:

  • 7am to 5pm Thursday 9 December and Friday 10 December – single lane closure
  • 9pm Sunday 12 December to 6am Wednesday 15 December – full road closure
  • Wednesday 15 December and Thursday 16 December from 6am to 9pm single lane closure, and from 9pm to 6am the following day, full road closure
  • 6am Friday 17 December to 9pm Sunday, 19 December – single lane closure
  • 9pm, Sunday 19 December to 6am Monday 20 December – full road closure
  • Monday 20 December and Tuesday 21 December – from 6am to 9pm single lane closure, and from 9pm to 6am the following day, full road closure

''

Region
Central Coast
Start date
Thu, 09 Dec 2021 07:00
End date
Wed, 22 Dec 2021 06:00
Affected routes

Old Northern Road, Wisemans Ferry and Maroota diversion

Transport for NSW will be carrying out urgent repairs to the heritage listed dry stone retaining wall and guard rail barrier, include some road resurfacing on Old Northern Road, at the last bend before entering Wisemans Ferry.

During full road closures, local access to Old Northern Road will be maintained under traffic control via Wisemans Ferry Road and River Road for residents and businesses located on either side of the work site.

General access will be maintained to the area north of the work area however using the following alternate route. Please note this route may take approximately 2 hours and 20 minutes of additional travel time so please plan accordingly.

  • Old Northern Road at Maroota, to Castle Hill Road, Pennant Hills Road, M1 Pacific Motorway, Peats Ridge Road, George Downes Drive and Wisemans Ferry Road to access the northern side of the Hawkesbury River. Note that the vehicle ferry will be required to cross to the township of Wisemans Ferry.
  • There are other local access routes in the area but these are not recommended due to the condition of the road not being suitable for high volumes of traffic or any heavy vehicles.

The work will take place from:

  • 7am to 5pm Thursday 9 December and Friday 10 December – single lane closure
  • 9pm Sunday 12 December to 6am Wednesday 15 December – full road closure
  • Wednesday 15 December and Thursday 16 December from 6am to 9pm single lane closure, and from 9pm to 6am the following day, full road closure
  • 6am Friday 17 December to 9pm Sunday, 19 December – single lane closure
  • 9pm, Sunday 19 December to 6am Monday 20 December – full road closure
  • Monday 20 December and Tuesday 21 December – from 6am to 9pm single lane closure, and from 9pm to 6am the following day, full road closure

''

 

Region
Western Sydney
Start date
Thu, 09 Dec 2021 07:00
End date
Wed, 22 Dec 2021 06:00

Temporary stand changes at Blacktown Interchange

Saturday 4 and Sunday 5 December 2021, Blacktown Interchange buses will depart from different stands to allow for the operation of rail replacement buses whilst trackwork is carried out on the main western line between Blacktown and Strathfield Stations.

  • Routes 730731732734735 from Stand M will depart from Stand K.
  • Route 743 from Stand N will depart from Stand G.

Interchange Map

Region
Western Sydney
Start date
Sat, 04 Dec 2021 01:00
End date
Mon, 06 Dec 2021 04:00

Phillip Street, St Marys diversion

Wednesday 17 November, there will be roadworks carried out on Phillip Street at St Marys, east of Lethbridge Street. The works will require the closure of Phillip Street between 8:00pm and 5am the following morning (NIght Work Only).

All 758, 759 & 774 services to and from St Marys will be diverted as shown below:

  • From St Marys Interchange via Lethbridge Street, across Phillip Street, left Chapel Street and then left or right onto Glossop Street to resume the normal route.
  • To St Marys Interchange via Glossop Street onto Chapel Street, right Lethbridge Street and across Phillip Street to the interchange via the normal route.

Traffic Controllers will be on site and if there are any passengers at the two bus stops on Phillip Street near Glossop Street, they will be directed to Lethbridge Street and the controllers will signal the bus to stop for them.

Customers can view the map below for the missed stops and diversion route.

''

Region
Western Sydney
Start date
Wed, 17 Nov 2021 20:00
End date
Thu, 18 Nov 2021 05:00